Eco Rules of Thumb

Biomass units need to be located within 1.5km of where the hot water will be consumed for heating and hot water before losses become too great.

The offset for a wind turbine - The minimum distances are 100m for the fall distance which nothing can be built, and 500m where wind assessments will need to be performed to assess any impact