Biomass units need to be located within 1.5km of where the hot water will be consumed for heating and hot water before losses become too great.
The offset for a wind turbine - The minimum distances are 100m for the fall distance which nothing can be built, and 500m where wind assessments will need to be performed to assess any impact
Subscribe to:
Posts (Atom)